Multiple Construction and Maintenance works completed for Camden Council, Strathfield Council, CommInsure, Metro Resources Group

 

Katoomba 2022

Hornsby 2022

Condell Park 2022

Yagoona 2022

Oran Park 2021

Oran Park 2021

Nelson Bay 2021

Padstow 2020

Port Kembla 2018

Oran Park Grand house & Granny Flat 2017

Oran Park Duplex 2017

Yagoona Duplex 2016

Entertainment Area 2016

Oran Park Freestanding home 2014

Corlette 2009

Sussex Inlet 2007

Large built brand new duplex located in the beautiful town of the new Oran Park.
As you can see in the photos this duplex has been built beautifully with nothing but the best finishes in and out.
Featuring:
Gas cooking
40mm ceasarstone kitchen
3m high ceiling
Air condition throughout
Modern bathrooms
Great large open living space
Walk in pantry
Floating stairs
Tiled throughout including garage
Big alfresco with opening bi-fold doors
Double shower in ensuite
Camera security system with alarms

Large built brand new duplex located in the Yagoona.
The owner requested design and built was for his new home
Featuring:
Gas cooking
40mm ceasarstone kitchen
High ceiling
Air condition throughout
Modern bathrooms
Great large open living space
Timber Patio decking
Timber stairs
Tiled throughout
Big alfresco
Camera security system with alarms

Entertainment area, complete with Gas BBQ, Charcoal Spit, Refridgeration, Running Water, Storage space

2 x Large built brand new Home located in the Sussex Inlet.
The owners requested design and built for relocation from Sydney
Featuring:

4 x Bedroom

2 x Bathroom
Gas cooking
Modern budget kitchen
2.7m High ceiling
Air condition throughout
Modern bathrooms
Great large open living space
Concrete Patio 
Timber flooring throughout
Camera security system with alarms

Group of four Townhouse in Port Kembla

Owner requested CC Consulting for quality built investment portfoli

Featuring:

3 - 4 bedroom 

2 bathrooms

Large walkin and builtin Robes

large lounge and dining area

Stone kitchen bench tops

Timber and tiled flooring

Carpeted bedrooms

Timber Stairways

Gas cooking and heating

Patio overlooking the courtyard

Security system

Katoomba  - Embankment Stabilisation Works

 

SITE ESTABLISHMENT
 Allow for site set-up;
 Allow for traffic management plans, approvals controls and approvals to facilitate works as required.
 Allow for protection of incoming power as required.
 Allow for scaffold access to the front of the subject wall, including geotextile spray protection/controls and certification of [80 m2]
 Allow for temporary toilet rental.
 Disconnect/make safe all services prior to demolition works.
 Dispose of all debris at an appropriate waste management facility.
 Allow for suitable sediment protection in adjacent areas
 Allow for site security fencing.
 Allow for concrete supply, line pump, shotcrete line etc.

 

UNDERPINNING
 Approximate dimensions of the underpinning of approximately 8.0 m.
 Allow to hand-excavate 450 x 450 concrete underpins, including 3 x N16 Bars, 200 mm embedment into the underside of footing and non-shrink grout, 1.5 m deep. [ 9 off]

 

EMBANKMENT STABILISATION
 Approximate dimensions of wall of 6.0 m x 17.0 m. [102 m2]
 Allow for removal of topsoil, vegetation and colluvium, scaling of loose blocks to expose in situ-sandstone bedrock. [50 m2]
 HOLD POINT: Allow for inspection by Geotechnical Engineer.
 Supply and install new HDGAL N25 GEWI rock bolts, 2000 mm each way max, stagger second row, galvanised plates, etc .[17 rock bolts, including approx. 3.0m embedment into sandstone]
 HOLD POINT: Allow for inspection by Geotechnical Engineer.
 Supply and install new 50 mm PVC drainage pipes at 2000 mm centres each way. [10 off]
 Supply and install new Atlantis Vertical strip drainage cells 52 x 260 mm wide cells at 2.0 m centres. [5 x 6 m long]
 Supply and install new SL92 mesh 2 x layers + 2xN16 each way at rock bolt locations (17 off) . [102 m2]
 Supply and install new HDGAL N20-300 starter bars at base of support, including cementicious grout embedment. [56 off]
 Allow to hand excavate 200 mm into toe of the shot –crete wall to socket strip footing into rock. [0.2 x 17.0 m]
 Allow to form and reinforced the toe – strip footing. 6 x N12 bars + N12-200 stirrups. [17. 0 m long]
 HOLD POINT: Allow for inspection by Structural Engineer.
 Supply and spray 40MPA, 175 mm min thick shot-crete wall dyed/ finished to match sandstone finish. [102 m2]

Hornsby - Embankment Stabilisation

 

Scope of Works: Includes the supply of Trades personnel and Materials to carry out the Works:
• Retaining Wall Repairs [approx 100m2]
• Allow for removal of topsoil, vegetation and colluvium, scaling of loose blocks to expose in situ-sandstone bedrock [70m2]
• Supply and install new HDGAL N25 GEWI rock bolts, 2000mm each way, stagger second row, galvanised plates etc [including 3.0m embedment into sandstone]
• Suppy an install new 50mm PVC drainage pipes at 2000mm centres each way [48 off]
• Supply and install new Atlantis Vertical strip drainage cells 52 x 260mm wide cells at 2.0m centres [8 x 8 m long]
• Supply and install new Atlantis strip filter pipe, horizontal, aggiline and associated 10mm aggregate surround. [1 x 14 lineal meters]
• Supply and install ne SL92 mesh 2 x layers + 2xN16 each way at rock bolt locations [40off]. [100m2]
• Supply and install new HDGAL N20-300 starter bars at base of support, including cementiocous grout embedment [45off]
• Allow to form up 500mm concrete curb at driveway edage, including N16-200 bars each way as per standard, 200mm thick
• Allow to dowel N16-400 HGGAL ‘L bars’ into face of existing driveway [36 off]
• Supply and spray 40MPA, 175mm min thick shot-crete wall dyed finish to match sandstone [100m2]
• Demolish existing brick up stand and timber balustrade [14 lineal m]
• Supply and install new powder coated balustrade to BCA requirements [14 lineal m]
• Allow to pressure was surrounding areas
• Allow for post-completion dilapidation survey of driveway